[Veritas-bu] Scheduling?

David Rock dave-bu at graniteweb.com
Fri Jan 30 23:46:20 CST 2004


* Stump, Robert (Contractor) (DRMS) <Robert.Stump at dla.mil> [2004-01-30 16:16]:
> Or
> In the same class (policy) have two FULL backup schedules with the window of
> opportunity set to exactly the same timeframe. 
> The only difference is retention and frequency. If both schedules have met
> the frequency requirement then, 
> only the one with the longest retention will be scheduled to run.
> This works for me.

It should also be noted that in this situation, if the window is large
enough, the schedule with the shorter retention may run if the first job
finishes while the window is still open.

Window for both schedules is 22:00 to 04:00
Monthly job completes at 01:00
Weekly job will run within a few minutes after 01:00 because it still
has an open window.

-- 
David Rock
david at graniteweb dot com
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: application/pgp-signature
Size: 189 bytes
Desc: not available
Url : http://mailman.eng.auburn.edu/pipermail/veritas-bu/attachments/20040130/acc6dd35/attachment.pgp


More information about the Veritas-bu mailing list