[Veritas-bu] Script for changing schedule retention levels

Schaefer, Harry Harry.Schaefer at turner.com
Mon Apr 12 18:49:01 CDT 2004


I dug through the archives to no avail. I am trying to find the right command line combination to change the retention level on a set of schedules. For example, changing the retention level from 8 (1 year) to 2 (5 weeks).

I am looking for the command to first give me a list of schedules, then a command to change a retention level on a given schedule. I can create the script to go around it, and even put it back out here for anyone to use.

We have a Solaris master server running 4.5 FP 4...

Thanks,
Harry S.
Atlanta



 


 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.eng.auburn.edu/pipermail/veritas-bu/attachments/20040412/7cc377cb/attachment.htm


More information about the Veritas-bu mailing list