[Ncame-students] Tube Furnace Operational
Michael Knotts
mjk0017 at auburn.edu
Wed Jan 13 16:14:55 CST 2021
Dr. Shamsaei,
The tube furnace has argon available for use and is fully operational again. I've been working with Christian and Emmanuel to get the third furnace set up in that room. Christian is contacting facilities to see about running power, and I'm waiting to hear on that.
Thanks,
Michael Knotts
Research Engineer/Lab Manager
National Center for Additive Manufacturing Excellence (NCAME)
Samuel Ginn College of Engineering
Auburn University
Phone: 334-844-2415
Email: mjk0017 at auburn.edu<mailto:Aah0007 at auburn.edu>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.eng.auburn.edu/pipermail/ncame-students/attachments/20210113/212a0c7e/attachment.html>
More information about the Ncame-students
mailing list